you've really done an amazing job on this kit. i can't imagine building it myself. i also can't imagine having to write the construction manual. just amazing from top to bottom.. such a great kit and a great job building it!
My Twin Mills complex was on hold for a long time, because I was building other structures on my layout. A few months ago, it was finally time to begin with the scenery. There are still some details to be added to the sawmill, and then it will be time to pour the resin.
This part on the layout, with the Twin Mills complex, presents wet weather, with rain still falling, so the lighting is adjusted.
Comments
My Twin Mills complex was on hold for a long time, because I was building other structures on my layout. A few months ago, it was finally time to begin with the scenery. There are still some details to be added to the sawmill, and then it will be time to pour the resin.
This part on the layout, with the Twin Mills complex, presents wet weather, with rain still falling, so the lighting is adjusted.
Here are some pictures of the current state:
More follows soon