visit sierrawestscalemodels.com

HO/HOn3 Backwoods Tie Mill

123457»

Comments

  • The close up really shows the the debris integrated into the dirt. Great idea to mix it all together before applying.
  • Thanks so much Travis! I find one of the more difficult scenic projects is working a relatively large area of open real estate as you describe. In order to have ruts and tire tracks, the dirt layer needs to be deep enough to accomplish this. Having a container full of the dirt with the debris mixed in it can be spread to whatever depth you want.
  • Hey Tom, I did a test piece first to get an idea of how much debris to mix in to get the right look. Mixing seemed the best way to integrate the debris effectively.
  • You never fail with your updates. Beautiful scenery work!!

    Jerry
  • Nice hearing from you Jerry and thanks much! Getting there, should have all the periphery scenic work done in a couple days. I will then be able to concentrate on the structure planting and detailing.
Sign In or Register to comment.